BHP posts file total-12 months iron ore output, flags rising costs

BHP posts file total-12 months iron ore output, flags rising costs


BHP Group’s symbol adorning the side of its world wide headquarters in Melbourne on February 21, 2023.

William West | AFP | Getty Visuals

BHP Group on Thursday described its highest at any time annual iron ore production, served by the ongoing ramp up at its South Flank functions in Western Australia but flagged it faces rising costs.

The world’s major stated miner reported unit costs at its Western Australia iron ore operations and Chilean copper mine Escondida are anticipated to be in direction of the upper end of forecast ranges, but stated funds and exploration investing would be under annual assistance, partly owing to foreign trade movements.

BHP’s iron ore production in Western Australia was aided by improved rail general performance at the mines, but manufacturing was partly hit by unfavorable impacts from tropical Cyclone Ilsa in the quarter.

It said iron ore output from Western Australia, on a 100% basis, was 72.7 million tonnes (Mt) in the a few months to June 30, a contact reduced than Seen Alpha estimates of 73 Mt, according to UBS.

The firm expects fiscal 2024 output for Western Australia iron ore between 282 million and 294 million metric tons, the mid-level of which is .9% better than annual generation of 285.3 million metric tons for fiscal 2023.

Weak iron ore prices will continue to affect mining companies' earnings, says fund manager

BHP, which concluded the $6.4 billion takeover of OZ Minerals in May possibly, reported copper creation rose 9% to 1,716.5 thousand metric tons in the fiscal.

It also forecast full copper creation for the 2024 fiscal year to be involving 1,720 and 1,910 thousand metric tons, aided by lengthy expected bigger grades at the world’s best copper mine and integration of Oz Minerals into its South Australian company.

It reaffirmed that output at South Flank would reach full capacity of 80 million metric tons for each annum, on a 100% basis, by the end of fiscal 2024.

BHP said it has begun accepting more feed from 3rd functions for its Nickel West operations which source the electrical car or truck battery business, right after rejecting feed from Mincor Assets with high arsenic degrees.



Resource

Japan’s exports fall for second straight month with no U.S. trade deal in sight, raising recession fears
World

Japan’s exports fall for second straight month with no U.S. trade deal in sight, raising recession fears

New Isuzu Motors Ltd. trucks bound for shipment at a port in Yokohama, Japan, on Sunday, July 13, 2025. Bloomberg | Bloomberg | Getty Images Japan’s exports in June contracted 0.5% year over year, extending the 1.7% drop seen in May as deliveries continued to decline for the second straight month. The decrease in exports […]

Read More
Asia-Pacific markets mostly fall as investors assess Japan’s trade data and Trump’s plans for Powell
World

Asia-Pacific markets mostly fall as investors assess Japan’s trade data and Trump’s plans for Powell

Singapore stocks extend rally to hit fresh all-time highs Singapore’s 30-stock benchmark Straits Times Index extended its winning run for a ninth consecutive day, hitting a fresh all-time high of 4,154.13 earlier in the session. Stock Chart IconStock chart icon Straits Times Index Chinese and Hong Kong stocks rise in early trade Chinese and Hong […]

Read More
CNBC Daily Open: U.S. producer prices are flat — but they don’t factor in imports
World

CNBC Daily Open: U.S. producer prices are flat — but they don’t factor in imports

A worker arc welds a metal door at the Metal Manufacturing Co. facility in Sacramento, California, U.S., on Tuesday, May 27, 2025. David Paul Morris | Bloomberg | Getty Images No one likes being the person who goes “but actually…”. Sometimes, however, it is necessary. The U.S. producer price index in June was flat, meaning […]

Read More